90kw Solar PV system installed in central Manchester, a complex commercial project requiring a crane lift, using JA Solar all black panels, Renusol East/West flat roof system & Solar Edge Technologies optimisers to maximise production with Solar Edge Inverters. We can take care of all your requirements for larger systems with a full turnkey service including Initial Design (we are a Solar Edge approved Installer).
228_JA Solar, JAM 54S30-405/MR all black solar panels
93_Solar Edge P850 - 4RMXMBY power optimisers
44_Solar Edge S440 - 1GM4MRM power optimisers
1_Solar Edge SE16K - 3 Phase Inverter
1_Solar Edge SE66.6K - 3 Phase Synergy Manager Inverter
Renusol FS10 E/W fixing rail system
A big thanks to our supply chain;
Edmunsons Electrical (Burnley) Ltd
Civils & Lintils (Bolton) Ltd
Elevate Electrical Services
Crane Lift required to lift 6 pallets with 228 solar panels, 14 pallets of concrete ballast blocks, Renosul fixing systems & other electrical equipment including Solar Edge Inverters and Power Optimisers
Renusol FS10 East/West fixing rail system employed, panels weighted down as per Renusol design with concrete blocks to comply with wind loading calculations
GRP Housing to protect Electrical Equipment, Solar Edge Synergy Manager 3 phase Inverters.
100 amp Switch Fuse 3 Phase supply.
Installing Solar PV, Battery Storage & EV Chargers in Lancashire,
Manchester and Across the North West
Tel: 0345 548 1878
Comments