
T&R Precision
Engineering
300 kw Commercial Solar Panel System
Glide Energy Ltd installed a commercial solar system on behalf of the Low Carbon Energy Co. to Aerospace Engineering factory in Lancashire
Large Commercial Installation
-
This Aerospace parts manufacturer are a very heavy industrial user of energy to power the machinery in their factory.
-
This large solar installation helps to dramatically reduce their energy usage whilst also reducing their Co2 emmissions every year, something which a company of this size is obligated to do as part of their environmental obligations.
-
The delivery of large amounts of materials were co-ordinated and delivered on the same day whilst utilising our own telehandler to off-load and safely store on site and lift to the roof space


System Details
3 Phase Commercial Solar
-
600 x Longhi HiMo 500 watt Panels with a 30 year linear performance warranty, guaranteeing the future output of the system
-
2 Solis SE100K Inverters complete with 3 phase 160amp isolators
-
New 3 phase Section Board installed with sub-mains linked into existing main section board including 3 phase metering for Inverters
-
We are experts at installing more complex 3 phase industrial systems
Commercial Software to Monitor the System
What does this involve?
We set up the client up with multiple a log ins to the monitoring software so that they view their solar production in real time:
-
They can produce monthly/annual reports to see exactly what savings they are making
-
They can produce reports to show the C02 savings made by generating free green electricity.
-
The system will even notify them if there are any faults with the electricty supply from the Grid.
Why not let us help you make savings, we offer no obligation free advice by experienced electricans / engineers not salesman, we're proud to help business make savings for a more secure financial future
