
T&R Precision
Engineering
300 kw Commercial Solar Panel System
Glide Energy Ltd installed a commercial solar system on behalf of the Low Carbon Energy Co. to Aerospace Engineering factory in Lancashire
Large Commercial Installation
-
This Aerospace parts manufacturer are a very heavy industrial user of energy to power the machinery in their factory.
-
This large solar installation helps to dramatically reduce their energy usage whilst also reducing their Co2 emmissions every year, something which a company of this size is obligated to do as part of their environmental obligations.
-
The delivery of large amounts of materials were co-ordinated and delivered on the same day whilst utilising our own telehandler to off-load and safely store on site and lift to the roof space


System Details
3 Phase Commercial Solar
-
600 x Longhi HiMo 500 watt Panels with a 30 year linear performance warranty, guaranteeing the future output of the system
-
2 Solis SE100K Inverters complete with 3 phase 160amp isolators
-
New 3 phase Section Board installed with sub-mains linked into existing main section board including 3 phase metering for Inverters
-
We are experts at installing more complex 3 phase industrial systems​
​
Commercial Software to Monitor the System
What does this involve?
We set up the client up with multiple a log ins to the monitoring software so that they view their solar production in real time:
-
They can produce monthly/annual reports to see exactly what savings they are making
-
They can produce reports to show the C02 savings made by generating free green electricity.
-
The system will even notify them if there are any faults with the electricty supply from the Grid.​
​
Why not let us help you make savings, we offer no obligation free advice by experienced electricans / engineers not salesman, we're proud to help business make savings for a more secure financial future



